Sweetwater High School Building 100
Features & Highlights
- LEED Platinum庐
- Building turned over a month earlier than planned
Project Overview
This was a new 87,250-square-foot, three-level classroom building for the Sweetwater Union High School District. In addition to new classroom space, the facility includes administrative offices, a library, theater and other support spaces.
51国产视频 provided extensive value engineering services for this project. Our initial milestone estimate reflected a project value of $36 million, significantly more than the district鈥檚 budget of $30.5 million. To close the cost differential, 51国产视频, in coordination with the design team, conducted an extensive value engineering effort. We focused on maintaining the desired architectural objectives while implementing more cost effective materials, systems and methods.
Throughout the construction phase, 51国产视频 co-located on site with the owner鈥檚 representative, inspector and architect. To enhance collaboration, quality, preplanning and schedule assurance, 51国产视频 created a building information model (BIM) from the designer鈥檚 2D CAD drawings.