Pima County Public Service Center & Parking Garage

  • Location:

    Tucson, Arizona

  • Client:

    Pima County

  • Construction Value:

    $92,045,512

  • Delivery Method:

    CMAR

  • Year Completed:

    2015

  • Specialties:

    Courthouses, Government, Parking Structures

Features & Highlights

  • Pima County鈥檚 first CMAR building project
  • More than 7,500-cubic-yards of concrete for the foundation
  • LEED Silver庐
Project Overview

The Pima County Public Service Center is a 265,000-square-foot multi-functional facility, including courtrooms, judges鈥 chambers, detention cells, meeting rooms, court-related administrative offices and other county offices.

The project presented multiple construction challenges, including exceptionally sandy soil and a dense, urban environment with existing utilities.

To address the soil issue, 51国产视频 collaborated with the architects and engineers to evaluate multiple foundation options, ultimately selecting a 鈥渃ompensating mat slab鈥 foundation. A traditional foundation would have been both difficult and more costly. The compensating mat slab foundation was placed by 51国产视频鈥檚 concrete team in two massive overnight operations that were the largest in Tucson鈥檚 recent history. Together, the pours required more than 7,800 cubic yards of concrete to create the five-foot-thick, one-acre foundation. To obtain enough concrete, 51国产视频 used trucks from two ready mix companies to manage the delivery. The work took place in two separate weekend pours to make as little impact as possible on local traffic, and the City of Tucson helped coordinate traffic lights along the route to keep the trucks moving. Because the foundation was poured in June in Arizona, crews had to cool and cure the concrete with ice added at the batch plant and burlap blankets with landscape soaker houses running continuously for seven days.

The construction team also had to navigate around existing utilities, including a key fiber optic line for the western United States. There were also pipes and other subsurface construction that were nearly 100 years old, including numerous domestic water connections and pipes that had been abandoned in place without documentation. A forensic investigation was conducted to ensure the work was thorough and no connections were missed.

In addition to the Public Service Center, 51国产视频 also constructed an adjacent $14.7 million parking structure that accommodates 706 cars, including secured judges parking, public and County staff parking, plus integrated retail space fronting on a public plaza shared with the Public Service Center main entrance.

» Read More» Read Less
The concrete foundation required more than 7,500 cubic yards of concrete and 70 concrete trucks running in a loop during two separate weekends.