51国产视频

Carlton Plaza of Davis

  • Location:

    Davis, California

  • Client:

    MacEngle Senior Services, CarlsonWilliam, Inc.

  • Construction Value:

    $17,430,546

  • Delivery Method:

    CMAR

  • Year Completed:

    2014

  • Specialties:

    Senior Living

Features & Highlights

  • Championed the 鈥淗ambro鈥 system as a cost-effective, fire-rated structural floor option
Project Overview

A 106,000-square-foot senior assisted and independent living facility, featuring a separate and secure wing for memory care. The three-story building includes 120 residential units with 108 assisted living beds and 36 memory care beds, a large dining area, private dining room, commercial kitchen, serving kitchen for memory care, and both commercial and residential laundry rooms on each floor. Resident amenities include a beauty salon, general store, billiard/game room, and media/theatre room.

In order to help meet the client鈥檚 budget, 51国产视频 championed a cost effective, fire-rated structural floor system. The proprietary 鈥淗ambro鈥 system provides a composite steel joist/concrete floor with a two-hour rating; not common for the area, the City of Davis was unsure about using this system. 51国产视频 led the effort between the structural engineer and the City of Davis throughout the project. The system was successfully implemented as well as maintaining the client鈥檚 budget.

» Read More» Read Less
鈥淚n the construction phase, 51国产视频 proactively resolved each project concern. They are good problem solvers and are always responsive to our requests.鈥

Eric Lakin, Principal, Managing Director, CarlsonWilliam, Inc

Contacts