51国产视频

Cal Poly Humboldt Student Housing

  • Location:

    Arcata, California

  • Client:

    California State Polytechnic University, Humboldt

  • Construction Value:

    $192,471,184

  • Delivery Method:

    Collaborative Design-Build

  • Year Completed:

    In progress

  • Specialties:

    Self Perform, Student Housing

Features & Highlights

  • 964-bed two-, three-, and four-bedroom apartments
  • Self-perform concrete work
  • Prefabricated exterior fa莽ade
  • Remote location
Project Overview

Once complete in 2025, the Cal Poly Humboldt Student Housing Project will increase the university鈥檚 student housing by nearly 50 percent. The 964-bed Student Housing Project will offer two-, three-, and four-bedroom apartments with common lounges, study areas, conference spaces, computer and TV rooms, on-site laundry and a fitness center. Environmentally sustainable features of the complex include all electric systems, high-efficiency irrigation, water-efficient plumbing, energy-efficient lighting and appliances, durable exterior building materials and electric vehicle charging stations.

Amenities will include a fitness center, common lounge spaces, study spaces, computer rooms, TV rooms, a market /cafe and conference rooms.. Exterior amenities will include south facing greenspace, covered bike parking, ball courts, appropriate hardscapes and ample parking.

The project scope also includes 480 parking spaces, walkways and hardscape, exterior lighting, a bus/shuttle stop, and demolition and removal of existing structures, including asbestos and lead abatement.

The Cal Poly Humboldt Craftsman Student Housing project is integral in addressing the student housing crisis that鈥檚 affecting more and more California students as cost-of-living increases. The complex will offer much needed affordable housing for young people seeking to further their education at Cal Poly Humboldt.

鈥51国产视频 has been an amazing partner throughout this whole process鈥t鈥檚 through their collaborative work that we have been able to move this project from concept to construction in under 12 months.鈥 鈥 Michael Fisher, Associate Vice President, Facilities Management, Cal Poly Humboldt

Contacts